Design

Infrastructure design studio

Place components on the site canvas. Atlas computes dependencies, resource requirements, capital and what is missing.

Site canvas · Kenya · click to place Solar PV
Design warning

Social capital contribution is low: this design is not yet legible to the community that hosts it.

Atlas suggests: Add community-owned components (microgrid, school, housing) or a local ownership tranche.

Intervention totals
Capital
$324M
Estimated · medium confidence
Net electricity
-13.9MW
Estimated · medium confidence
net generator
Net water
-17,014m³/d
Estimated · medium confidence
Land
89ha
Estimated · medium confidence
Jobs
295
Estimated · low confidence
Net CO₂e
-36,300t/yr
Estimated · low confidence
Beneficiaries
218K
Modeled · low confidence
Integrity
54/100
Estimated · confidence Low · provenance

Atlas component library — per-unit capex, load, water, land and employment intensities derived from published project benchmarks. Site-specific engineering will differ materially.. Atlas does not present modelled output as observed fact. Where confidence is low, treat the value as a hypothesis to be tested, not a measurement.

Data provenance · design factors8 metrics traced

Observed = direct measurement. Reported = published by the named source. Estimated = Atlas estimate from partial public data. Modeled = model output, not a measurement.

Design capex · Estimated · medium confidence

Total capital cost of the placed components.

Method. Σ(unit capex × count) using Atlas component library factors.

Inputs. component unit capex · component counts

Caveat. Excludes land acquisition, financing costs and country risk premia.

Net electricity · Estimated · medium confidence

Net electricity balance of the design: generation minus load, MW.

Method. Σ(unit MW × count); generation positive, load negative.

Inputs. component MW factors · component counts

Water balance · Estimated · medium confidence

Net water balance of the design, m³/day.

Method. Σ(unit m³/day × count); treatment/reuse negative, consumption positive.

Inputs. component water factors · component counts

Land take · Estimated · medium confidence

Total land footprint, hectares.

Method. Σ(unit ha × count).

Inputs. component land factors · component counts

Caveat. Setbacks, easements and access roads are not modelled.

  • Atlas Sanctum — Atlas component library — unit capex, load, land and labour factors (2025)
Jobs · Estimated · low confidence

Direct operating roles supported by the design.

Method. Σ(unit jobs × count); indirect and induced employment excluded.

Inputs. component labour factors · component counts

Net CO₂e · Estimated · low confidence

Net annual operational emissions of the design, tCO₂e/yr.

Method. Σ(unit tCO₂e/yr × count); sequestration components carry negative factors.

Inputs. component emission factors · component counts

Caveat. Embodied carbon of construction is not included.

  • Atlas Sanctum — Atlas component library — unit capex, load, land and labour factors (2025)
Beneficiaries · Modeled · low confidence

People materially served by the design.

Method. jobs × 4.2 household multiplier + water and electricity service coefficients.

Inputs. jobs · net water · net electricity

Caveat. A coarse multiplier; treat as an order of magnitude.

Seven capitals contribution · Modeled · low confidence

Contribution of the design to each of the seven capitals, 0–100.

Method. Count-weighted mean of per-component capital scores.

Inputs. component capital profiles · component counts

Caveat. Capital scores are expert judgement, not measurement.

  • Atlas Sanctum — Atlas component library — unit capex, load, land and labour factors (2025)