Finance this future
Capital is infrastructure too. Change the blend and watch feasibility, cost and patience move.
Distributed Solar + Storage Network
Nairobi Metropolitan Region
Modeled · confidence Medium · provenance
Atlas capital model — weighted cost, patience and risk appetite per source class. Indicative only; not investment advice.. Atlas does not present modelled output as observed fact. Where confidence is low, treat the value as a hypothesis to be tested, not a measurement.
Enables land, permitting and counter-guarantees.
Long tenor, catalytic, slow to close.
Needs contracted, creditworthy revenue.
Requires measurable mitigation or adaptation.
Best used as first-loss and design capital.
Enters after operational track record.
Builds social licence and local ownership.
Pays on verified impact, needs strong MRV.
Observed = direct measurement. Reported = published by the named source. Estimated = Atlas estimate from partial public data. Modeled = model output, not a measurement.
Total capex · Estimated · medium confidence
Capital requirement of the selected opportunity.
Method. Atlas opportunity sizing from comparable projects and unit-cost benchmarks.
Inputs. opportunity scope · unit cost benchmarks
- Global Infrastructure Hub — Global Infrastructure Outlook (2023) · https://outlook.gihub.org
- Atlas Sanctum — Atlas component library — unit capex, load, land and labour factors (2025)
Blended cost of capital · Modeled · medium confidence
Weighted average cost of the capital stack, % per year.
Method. Σ(share × source cost of capital) over the stack, normalised to the stack total.
Inputs. stack shares · per-source cost of capital
Caveat. Indicative only; not investment advice. Currency and country risk are not priced.
- Atlas Sanctum — Atlas capital model — weighted cost, patience, risk appetite (2025)
- Global Infrastructure Hub — Global Infrastructure Outlook (2023) · https://outlook.gihub.org
Annual capital service · Modeled · medium confidence
Annual cost of servicing the stack.
Method. capex × blended cost of capital.
Inputs. capex · blended cost
- Atlas Sanctum — Atlas capital model — weighted cost, patience, risk appetite (2025)
Feasibility · Modeled · low confidence
Likelihood the stack can actually close, 0–100.
Method. 38 + (12 − blended cost) × 4.2 + patience and risk-appetite terms, penalised where the stack does not total 100%.
Inputs. blended cost · patience · risk appetite · stack total
Caveat. Ignores sponsor track record, regulatory approval and offtake credit quality.
- Atlas Sanctum — Atlas capital model — weighted cost, patience, risk appetite (2025)
Patience · Modeled · low confidence
Tolerance of the stack for long payback horizons, 0–100.
Method. Share-weighted mean of per-source patience scores.
Inputs. stack shares · per-source patience
- Atlas Sanctum — Atlas capital model — weighted cost, patience, risk appetite (2025)
Risk appetite · Modeled · low confidence
Tolerance of the stack for construction and offtake risk, 0–100.
Method. Share-weighted mean of per-source risk appetite scores.
Inputs. stack shares · per-source risk appetite
- Atlas Sanctum — Atlas capital model — weighted cost, patience, risk appetite (2025)